Crystal Spring Farm (Brunswick, ME)

$
0
0
Example ground mounted solar farm (installed project will look different)
Example ground mounted solar farm (installed project will look different)

This is a CLOSED solar farm and is being filled through a select group of members.

Overview and System Location:

The Resource Conservation SolarFarm will be located on the property at 277 Pleasant Hill Road in Brunswick, EM. The solar array will be installed just to the west of the farm complex adjacent to Woodside road. The solar array will be installed on a ground mounted racking structure that will run along one of the existing fence lines. The site is level and clear of obstructions. The solar access is excellent and will result in a highly efficient solar system.

System Design:

Crystal Spring Farm-2The proposed solar farm has an estimated size of 80.6kW. The solar system will consist of 260 Q-Cells 310 watt polycrystalline solar modules mounted to a pile driven ground mounted racking system. The modules will be wired together in a series and parallel configuration and then interconnected to the utility grid through SMA TL grid tied inverters. The array performance will be monitored by a SolarLog utility grade meter system which provides access to real time system performance to members, and facilitates the sale of Renewable Energy Credits.

Note 1: all component specifications are preliminary and components may be substituted for the functional equivalents until project final design and contract

System Performance:
Module Orientation: 168 degrees (true)
Module Pitch: 35 degrees
Total Solar Resource Fraction: 95%

At this nearly ideal solar site and with the benefit of effective convective module cooling from the ground mounted system, the Resource Conservation SolarFarm is expected to produce 1,253 kwhr per kW on average through the year. ReVision Energy’s solar advisors will be glad to size a share in the solar farm to meet your particular renewable energy goals.

Crystal Spring Farm-3

Overall System size: 80.6kW
Minimum Share size: NA
Total number of shares available: (0) This solar farm is closed to new sales
Expected Construction date: Spring 2016

The post Crystal Spring Farm (Brunswick, ME) appeared first on Maine Solar Farms.